Neutrino astronomy

Results: 396



#Item
51Project Performance International http://www.ppi-int.com/newsletter/SyEN-037.php SYSTEMS ENGINEERING NEWSLETTER brought to you by Project Performance International (PPI)

Project Performance International http://www.ppi-int.com/newsletter/SyEN-037.php SYSTEMS ENGINEERING NEWSLETTER brought to you by Project Performance International (PPI)

Add to Reading List

Source URL: www.ppi-int.com

Language: English - Date: 2011-10-23 21:14:24
52Overview of the ANITA project Steven Barwickb, James Beattyc, David Bessond, John Cleme, Stephane Coutuc, Michael DuVernoisf, Paul Evensone, Peter Gorham*g, Francis Halzenh, Abram Jacobseni, David Kiedaj, John Learnedg,

Overview of the ANITA project Steven Barwickb, James Beattyc, David Bessond, John Cleme, Stephane Coutuc, Michael DuVernoisf, Paul Evensone, Peter Gorham*g, Francis Halzenh, Abram Jacobseni, David Kiedaj, John Learnedg,

Add to Reading List

Source URL: data.duvernois.org

Language: English - Date: 2009-03-30 21:12:00
53

PDF Document

Add to Reading List

Source URL: www.physics.org

Language: English - Date: 2013-09-03 11:29:44
54IceCube Project Monthly Report – February 2011 Accomplishments  The final IceCube summer personnel safely departed Antarctica. There are two people staying through the winter at South Pole to maintain the data manag

IceCube Project Monthly Report – February 2011 Accomplishments  The final IceCube summer personnel safely departed Antarctica. There are two people staying through the winter at South Pole to maintain the data manag

Add to Reading List

Source URL: icecube.wisc.edu

Language: English
55IceCube Project Monthly Report - July 2008 Accomplishments • The Integrated Master Schedule is currently being revised based upon RPSC support, flight changes and station opening constraints. Currently, Drilling begins

IceCube Project Monthly Report - July 2008 Accomplishments • The Integrated Master Schedule is currently being revised based upon RPSC support, flight changes and station opening constraints. Currently, Drilling begins

Add to Reading List

Source URL: icecube.wisc.edu

Language: English
56IceCube Project Monthly Report - November 2008 Accomplishments • Completed commissioning of the IceCube Seasonal Equipment Site and started deep ice drilling on December 3rd, two days ahead of schedule. The quick start

IceCube Project Monthly Report - November 2008 Accomplishments • Completed commissioning of the IceCube Seasonal Equipment Site and started deep ice drilling on December 3rd, two days ahead of schedule. The quick start

Add to Reading List

Source URL: icecube.wisc.edu

Language: English
57IceCube Project Monthly Report – January 2009 Accomplishments • January was an extremely productive month for drilling and string installation. Nine holes were safely drilled in January resulting in a total of 19 str

IceCube Project Monthly Report – January 2009 Accomplishments • January was an extremely productive month for drilling and string installation. Nine holes were safely drilled in January resulting in a total of 19 str

Add to Reading List

Source URL: icecube.wisc.edu

Language: English
58IceCube Project Monthly Report – January 2011 Accomplishments  The strings installed in December were commissioned in January and will be incorporated into the existing IceCube array during the month of February.

IceCube Project Monthly Report – January 2011 Accomplishments  The strings installed in December were commissioned in January and will be incorporated into the existing IceCube array during the month of February.

Add to Reading List

Source URL: icecube.wisc.edu

Language: English
59IceCube Project Monthly Report – April 2009 Accomplishments • Interviews for seasonal driller positions were completed and positions filled. Support and logistical requirements for the 2009–2010 Season were submitt

IceCube Project Monthly Report – April 2009 Accomplishments • Interviews for seasonal driller positions were completed and positions filled. Support and logistical requirements for the 2009–2010 Season were submitt

Add to Reading List

Source URL: icecube.wisc.edu

Language: English
60Search for Dark Matter from the Galactic Halo with the IceCube Neutrino Observatory – Paper Review Stephen Portillo Review of R. Abbasi et al. (IceCube Collaboration), Phys. Rev. D 84, ).

Search for Dark Matter from the Galactic Halo with the IceCube Neutrino Observatory – Paper Review Stephen Portillo Review of R. Abbasi et al. (IceCube Collaboration), Phys. Rev. D 84, ).

Add to Reading List

Source URL: portillo.ca

Language: English - Date: 2013-07-27 00:55:57